XIE Li. Economic Design of Control Charts With Warning Limits in Complete Inspection Under the Run Rules[J]. Journal of Beijing University of Technology, 2009, 35(5): 690-696.
    Citation: XIE Li. Economic Design of Control Charts With Warning Limits in Complete Inspection Under the Run Rules[J]. Journal of Beijing University of Technology, 2009, 35(5): 690-696.

    Economic Design of Control Charts With Warning Limits in Complete Inspection Under the Run Rules

    • This paper studies an economic design of a complete inspection with run rules.Two process states, in-control and out-of-control, are assumed.If the inspection signals that the process is out of control under run rules, remedial action is taken to restore the process to the in control state.Inspected items are either accepted with a quality cost or reworked according to the observed quality characteristic.A cost model is developed in this paper to determine the specification limits and action limits.
    • loading

    Catalog

      Turn off MathJax
      Article Contents

      /

      DownLoad:  Full-Size Img  PowerPoint
      Return
      Return