Citation: | TAO Lian-jin, BIAN Jin, ZHANG Yin-tao. Comparative Analysis of Two Different Excavation Methods of Subway Station[J]. Journal of Beijing University of Technology, 2004, 30(2): 180-184. |
[1] |
唐益群,叶为民,张庆贺.上海地铁盾构施工引起地面沉降的分析研究(三)[J].地下空间,1995,15(4) :250-259. TANG Yi-qun, YE Wei-min, ZHANG Qing-he. Analysis of ground settlement by shield construction in Shanghai (Ⅲ)[J]. Underground Space, 1995, 15(4) : 250-259. (in Chinese)
|
[2] |
方从启,孙钧.软土地层中隧道开挖引起的地面沉降[J].江苏理工大学学报,1998,3(3) :30-35. FANG Cong-qi, SUN Jun. Ground settlelment induced by tunneling in soft soils[J]. Journal of Jiangsu University of Science and Technology, 1998, 3(3) : 30-35. (in Chinese)
|
[3] |
朱忠隆,张庆贺.盾构法施工对地层扰动的试验研究[J].岩土力学,2000,21(1) :105-108. ZHU Zhong-long, ZHANG Qing-he. Test research on the behavior of the disturbed soiled by shield tunneling[J]. Rock and Soil Mechanics, 2000, 21(1) : 105-108. (in Chinese)
|
[4] |
方从启,孙钧.浅层顶管施工引起的土体移动[J].岩土力学,200I,22(5) :82-85. FANG Cong-qi, SUN Jun. Ground movements induced by pipe jacking in shadow underground soils[J]. Rock and Soil Mechanics, 2001, 22(5) : 82-85. (in Chinese)
|
[1] | AN Junhai, AN Linxuan, LI Jidong, CHEN Xianghong, GUO Fei. Response Displacement Method in Several Key Issues of Shallow Buried Underground Structure Seismic Design[J]. Journal of Beijing University of Technology, 2016, 42(6): 926-932. DOI: 10.11936/bjutxb2015080015 |
[2] | ZHANG Ming-ju, LI Yun-gang, LI Fang, WANG Cheng. Inner Support Mechanical Parameters Study of Open-cut Subway Station Supporting Structure[J]. Journal of Beijing University of Technology, 2014, 40(10): 1512-1517. |
[3] | ZHANG Ming-ju, HE Huan, LI Chun-hui, SU Zhi-yong, LIU Xiao-juan. Deformation and Force Analysis on Retaining Structure of an Open-excavated Subway Station by Monitoring and Numerical Simulation[J]. Journal of Beijing University of Technology, 2013, 39(6): 875-880. |
[4] | ZHANG Ming-ju, NIU Da-wei. Support Structure Internal Force Monitoring and Analysis for Undercut Metro Tunnel in Crossing the Existing Line[J]. Journal of Beijing University of Technology, 2010, 36(12): 1624-1630. |
[5] | GUO Yan-jing, FANG Qian, LI Bing. Reinforcement Mechanism and Mechanical Analysis for Pipe Roof Support Used in Subway Station With Shallow Tunnel Construction Method[J]. Journal of Beijing University of Technology, 2010, 36(1): 40-45. |
[6] | SU Jie, ZHANG Ding-li, NIU Xiao-kai. Deformation Control of Crossing Over Existing Bridge by Shallow Tunneling[J]. Journal of Beijing University of Technology, 2009, 35(5): 611-620. |
[7] | ZHANG Ming-ju, ZHANG Wen-yu, DU Xiu-li, LI Feng-wei. Application of a Composite Soil Nailing System in Excavation Engineering Close to an Expressway[J]. Journal of Beijing University of Technology, 2009, 35(2): 174-178. |
[8] | DING Yong-chun, DAI Bin, WANG Jian-hua, XU Zhong-hua. Field Observation of a Deep Excavation Adjacent to Subway Tunnels[J]. Journal of Beijing University of Technology, 2008, 34(5): 492-497. |
[9] | LU Chuan-bo, ZHANG Ming-ju, CAO Shui-qun, WANG Shuang-long, JIANG Yi-fan. Preferred Construction Solution for Xidan Station Engineering on Line 4# of Beijing Subway[J]. Journal of Beijing University of Technology, 2007, 33(2): 160-165. |
[10] | ZHANG Ming-ju, YOU Hai-liang, DU Xiu-li, WANG Yan, ZHANG Wen-yu. Construction Monitoring Analysis for an Open Excavated Foundation-pit of a Subway Station in Beijing[J]. Journal of Beijing University of Technology, 2006, 32(10): 874-878. |