ZHANG Ming-ju, HE Huan, LI Chun-hui, SU Zhi-yong, LIU Xiao-juan. Deformation and Force Analysis on Retaining Structure of an Open-excavated Subway Station by Monitoring and Numerical Simulation[J]. Journal of Beijing University of Technology, 2013, 39(6): 875-880.
Citation: ZHANG Ming-ju, HE Huan, LI Chun-hui, SU Zhi-yong, LIU Xiao-juan. Deformation and Force Analysis on Retaining Structure of an Open-excavated Subway Station by Monitoring and Numerical Simulation[J]. Journal of Beijing University of Technology, 2013, 39(6): 875-880.

Deformation and Force Analysis on Retaining Structure of an Open-excavated Subway Station by Monitoring and Numerical Simulation

More Information
  • Received Date: January 09, 2011
  • Available Online: November 02, 2022
  • The simulation of forced deformation on retaining structure of an open-excavated subway station was carried out using the software FLAC3D,and a comparative analysis with field data was accomplished.The established numerical simulation methods are used to analyze the horizontal deformation of pile body in different pre-axial force loading schemes.The relationship between brace stiffness variation and retaining structure deformation and the relationship between variation of fender pile stiffness and retaining structure deformation were studied.Resultsshow that 1) steel support pre-applied a reasonable axial force can prevent and reduce the deformation of retaining structure,and a recommended value is 80% of the design value of the axial force;2) pit top horizontal displacement can be reduced by increasing the rigidity of the steel support in strict deformation requisition;and 3) the pile horizontal deformation will decrease obviously with the increase of fender pile diameter,and the effect will become inconspicuous when the pile diameter is to large.From the perspective of controlling pit deformation,structure designs should select an appropriate size of the pile diameter and take economic benefit into account.
  • [1]
    高涛,刘永勤,王伟,等.地铁车站深基坑围护结构变形及内力影响因素研究[J].工程勘察,2010(增1):223-230.GAO Tao,LIU Yong-qin,WANG Wei,et al.FLACanalysis of affecting factors to retaining structure of deepexcavation of subway station[J].GeotechnicalInvestigation&Surveying,2010(S1):223-230.(inChinese)
    [2]
    姚燕明,周顺华,孙巍,等.支撑刚度及预加轴力对基坑变形和内力的影响[J].地下空间,2003(4):401-404.YAO Yan-ming,ZHOU Shun-hua,SUN Wei,et al.Influence of brace stiffness and pre-axial force on thedeformation and internal force of foundation pit[J].Underground Space,2003(4):401-404.(in Chinese)
    [3]
    彭宇.地铁车站深基坑支护体系设计研究[D].西安:西安建筑科技大学土木工程学院,2008.PENG Yu.Study on design for retaining system in deepfoundation pit of the subway station[D].Xi'an:School ofCivil Engineering,Xi'an University of Architecture andTechnology,2008.(in Chinese)
    [4]
    谭志勇,王余庆,周根寿.支护结构内力和变形的影响因素分析[J].工业建筑,1999(5):12-15.TAN Zhi-yong,WANG Yu-qing,ZHOU Gen-shou.Analysis of influence factors of internal force anddeformation in a support structure[J].IndustrialConstruction,1999(5):12-15.(in Chinese)
    [5]
    郑刚,顾晓鲁.考虑支撑-围护桩-土相互作用的基坑支护水平支撑温度应力的简化分析法[J].土木工程学报,2002(3):87-89,108.ZHENG Gang,GU Xiao-lu.Simple method for calculatingtemperature stress in horizontal strut of foundation pitconsidering strut-pile-soil interaction[J].China CivilEngineering Journal,2002(3):87-89,108.(inChinese)
    [6]
    吴明,孙鸣宇,夏唐代,等.多层支撑深基坑中考虑支撑—围护桩—土相互作用的水平支撑温度应力简化计算方法[J].土木工程学报,2009,42(1):91-95.WU Ming,SUN Ming-yu,XIA Tang-dai,et al.Simplifiedmethod of calculating temperature stress in multi-layerstruts for deep excavations considering strut-pile-soilinteractions[J].China Civil Engineering Journal,2009,42(1):91-95.(in Chinese)
    [7]
    任建喜,高涛.地铁换乘站深基坑围护结构变形规律FLAC模拟研究[J].铁道工程学报,2008(9):80-83,99.REN Jian-xi,GAO Tao.Research on the deformation lawof deep excavation supporting structure in metrointerchange station by FLAC simulation[J].Journal ofRailway Engineering Society,2008(9):80-83,99.(inChinese)
    [8]
    孙凯,许振刚,刘庭金,等.深基坑的施工监测及其数值模拟分析[J].岩石力学与工程学报,2004,23(2):293-298.SUN Kai,XU Zhen-gang,LIU Ting-jin,et al.Onstructionmonitoring and numerical simulation foundation of ananalysis pit[J].Chinese Journal of Rock Mechanics andEngineering,2004,23(2):293-298.(in Chinese)
    [9]
    姜忻良,宗金辉,孙良涛.天津某深基坑工程施工监测及数值模拟分析[J].土木工程学报,2007,40(2):79-84.JIANG Xin-liang,ZONG Jin-hui,SUN Liang-tao.Construction monitoring and numerical simulation for adeep excavation in Tianjin[J].China Civil EngineeringJournal,2007,40(2):79-84.(in Chinese)

Catalog