Citation: | ZHANG Ming-ju, ZHANG Wen-yu, DU Xiu-li. Structure Internal Force Monitoring and Analysis for Subway Tunnels in the Function of Adjacent Bridge Pile[J]. Journal of Beijing University of Technology, 2008, 34(8): 830-835. |
[1] |
CHENL T,POULOS H G,LOGANATHAN N.Pile responses caused by tunneling[J].Journal of Geotechnical and Geoenviromental Engineering,1999,125(3):207-215.
|
[2] |
MROUEH H,SHAHROUR I.Three-dimensional finite dement analysis of the interaction between tunneling and pile foundations[J].International Journal for Numerical and Analytical Methods in Geomechanics,2002(26):217-230.
|
[3] |
张汎,刘军,萧岩,等.隧道施工引起地层位移对桥梁桩基的影响分析[J].市政技术,2005,23(增刊):86-89.ZHANG Fan,LIU Jun,XIAO Yan,et al.Affecting analysis on existing bridge pile foundation of ground displacement induced by tunnel construction[J].Muncipai Engineering Technology,2005,23(Supp):86-89.(in Chinese)
|
[4] |
何海建,项彦勇,刘维宁,等.地铁车站隧道群施工对邻近桥桩影响的数值分析[J].北京交通大学学报,2006,30 (4):54-59.HE Hai-jian,XIAN Yan-yong,LIU Wei-ning,et al.Numerical analysis of the multiple tunneling effects at a metro station construction on adjacent bridge piles[J].Journal of Beijing Jiaotong University,2006,30(4):54-59.(in Chinese)
|
[5] |
李强,王明年,李德才,等.地铁车站暗挖隧道施工对既有桩基的影响[J].岩石力学与工程学报,2006,25(1):184- 190.LI Qiang,WANG Ming-nian,LI De-cai,et al.Effects of subsurface construction of metro station tunnel on existing pile foundation[J].Chinese Journal of Rock Mechanics and Engineering,2006,25(1):184-190.(in Chinese)
|
[6] |
李永盛,黄海鹰.盾构推进对相邻桩体力学影响的实用计算方法[J].同济大学学报,1997,25(3):274-280.LI Yong-sheng,HUANG Hai-ying.Computation of mechanical effects of adjacent piles by shield excavation[J].Journa of Tongji University,1997,25(3):274-280.(in Chinese)
|
[7] |
CHEN L T,POULOS H G.Effect of tunnelling onPiled foundations[C]//Proc 9th Int Conf on CompoterMethods and Advances in Geomechanics,Balkema:[s.n.]1997:2183-2188.
|
[8] |
王晓霞.桩与隧道相互影响研究进展[J].西部探矿工程,2007,3:152-155.WANG Xiao-xia.Interaction research progress of piles and tunnel[J].West-China Exploration Engineering,2007,3:152- 155.(in Chinese)
|
[9] |
张明聚,由海亮.北京地铁某车站明挖基坑施工监测分析[J].北京工业大学学报,2006,32(10):874-878.ZHANG Ming-ju,YOU Hai-liang.Construction monitoring analysis for an open excavated foundation-pit of a subway station in Beijing[J].Journal of Beijing University of Technology,2006,32(10):874-878.(in Chinese)
|
[10] |
关宝树.隧道工程施工要点集[M].北京:人民交通出版社,2003.
|
[11] |
崔玖江.超浅埋暗法修建隧道关键施工技术[M].北京:科学出版社,2005.
|
[12] |
李晓红.隧道新奥法及其量测技术[M].北京:科学出版社,2000.
|
[13] |
崔天麟.超浅埋暗挖隧道初期支护结构内力监测及稳定性分析[J].现代隧道技术,2001,38(2):29-33.CUI Tian-lin.Structural internal force monitoring and stability analysis on primary lining of bored tunnel with a shallow depth[J].Modern Tunnelling Technology,2001,38(2):29-33.(in Chinese)
|
[14] |
张宝才,徐祯祥.超浅埋暗土质隧道的位移和力学传递特性[J].铁道建筑,2000,9:9-11.ZHANG Bao-cai,XU Zhen-xiang.characteristics of displacement and mechanical transmission for soil tunnel with a shallow depth[J].Railway Engineefing,2000(9):9-11.(in Chinese)
|
[1] | LIU Zhansheng, YUAN Chao, WANG Yubo, ZHANG Anshan, SHI Guoliang. BIM-based Intelligent Monitoring Method for Super Tall Building With Multi-source Information[J]. Journal of Beijing University of Technology, 2021, 47(4): 357-364. DOI: 10.11936/bjutxb2020110035 |
[2] | ZHAI Tianrui, ZHOU Puxi, NIU Lianze. Research Progresses on Performance Manipulation of Distributed Feedback Polymer Lasers[J]. Journal of Beijing University of Technology, 2020, 46(6): 655-663. DOI: 10.11936/bjutxb2019120026 |
[3] | XIE Hongyun, WU Jiahui, LIU Rui, GAO Jie, MA Pei, ZHANG Wanrong. Dynamic Signal Feedback Gain Control Circuit Based on PIN Diode[J]. Journal of Beijing University of Technology, 2018, 44(11): 1391-1395. DOI: 10.11936/bjutxb2017120019 |
[4] | ZHAI Tian-rui, LI Song-tao, WANG Zhao-na, SHI Jin-wei, LIU Da-he, ZHANG Xin-ping. Thin-film Random Lasers With Plasmonic Feedback(Invited Paper)[J]. Journal of Beijing University of Technology, 2015, 41(12): 1783-1788. DOI: 10.11936/bjutxb2015070036 |
[5] | YANG Yan-jun, YUE Zu-run, WANG Shuo. Information Construction Technology of Box-culverts Underpass the Airport Taxiway[J]. Journal of Beijing University of Technology, 2013, 39(9): 1316-1322. |
[6] | ZHOU Jun, YU Yue-qing. Trajectory Tracking Control of Modular Robot Based on Real-time Position Feedback[J]. Journal of Beijing University of Technology, 2012, 38(8): 1136-1142. |
[7] | XIE Hong-yun, LU Zhi-yi, HUO Wen-juan, DING Chun-bao, LIU Bo-yu, ZHANG Dong-hui, ZHANG Wan-rong. Study of Feedback Technology for Gain Flatness of UWB LNA[J]. Journal of Beijing University of Technology, 2011, 37(11): 1638-1643. |
[8] | ZHANG Ming-ju, NIU Da-wei. Support Structure Internal Force Monitoring and Analysis for Undercut Metro Tunnel in Crossing the Existing Line[J]. Journal of Beijing University of Technology, 2010, 36(12): 1624-1630. |
[9] | ZHANG Ming-ju, WANG Cheng-hao, LÜ Qi, YE Xin-feng. Construction Monitoring Analysis for Large Cross-section Tunnel Excavation of Passenger Dedicated Railway[J]. Journal of Beijing University of Technology, 2010, 36(10): 1350-1356. |
[10] | ZHANG Ming-ju, YOU Hai-liang, DU Xiu-li, WANG Yan, ZHANG Wen-yu. Construction Monitoring Analysis for an Open Excavated Foundation-pit of a Subway Station in Beijing[J]. Journal of Beijing University of Technology, 2006, 32(10): 874-878. |