• 综合性科技类中文核心期刊
    • 中国科技论文统计源期刊
    • 中国科学引文数据库来源期刊
    • 中国学术期刊文摘数据库(核心版)来源期刊
    • 中国学术期刊综合评价数据库来源期刊
GAO Chao, LIU Xiao-ming, YANG Xiao-kuan, HUA Xiang-gang, ZHANG Tong-yang. Delay of Bus Rapid Transit at a Bus Stop[J]. Journal of Beijing University of Technology, 2014, 40(12): 1844-1847. DOI: 10.3969/j.issn.0254-0037.2014.12.012
Citation: GAO Chao, LIU Xiao-ming, YANG Xiao-kuan, HUA Xiang-gang, ZHANG Tong-yang. Delay of Bus Rapid Transit at a Bus Stop[J]. Journal of Beijing University of Technology, 2014, 40(12): 1844-1847. DOI: 10.3969/j.issn.0254-0037.2014.12.012

Delay of Bus Rapid Transit at a Bus Stop

More Information
  • Received Date: December 17, 2013
  • Available Online: January 10, 2023
  • To analyze the delay of bus rapid transit (BRT) at a bus stop, the data of line BRT- 1 at Jinan city was collected by manual counts and video capture to model deceleration/acceleration and dwell time. Then the delay time at the bus stop was computed.Resultsshow that the time boarding per passenger is longer than alighting. There is positive correlation between density of passengers in BRT and time boarding per passenger as well as lost time at the stop. The delay time of BRT at the bus stop is at least 12.5 seconds.
  • [1]
    吴家庆, 林正.北京市南中轴路快速公交运营效果分析[J].城市交通, 2007 (4) :82-86.WU Jia-qing, LIN Zheng.An operational analysis of the BRT system along Beijing south-central corridor[J].Urban Transport of China, 2007 (4) :82-86. (in Chinese)
    [2]
    TCRP.Transit capacity and quality of service manual[R].2nd ed.Washington D.C.:TRB, 2003:4-10.
    [3]
    胡非与.快速公交专用道通行能力及线路优化布设研究[D].广州:华南理工大学土木与交通学院, 2010.HU Fei-yu.Research on capacity of bus rapid transit lane and optimization of route adjusting[D].Guangzhou:School of Civil Engineering and Transportation, South China University of Technology, 2010. (in Chinese)
    [4]
    魏涛.快速公交系统通行能力分析[D].长沙:长沙理工大学交通运输工程学院, 2006.WEI Tao.Capacity analysis of bus rapid transit system[D].Changsha:School of Traffic and Transportation Engineering, Changsha University of Science&Technology, 2006. (in Chinese)
    [5]
    高奇修.BRT通行能力应用研究[J].山西建筑, 2009 (21) :265-266.GAO Qi-xiu.The application study of BRT traffic capacity[J].Shanxi Architecture, 2009 (21) :265-266. (in Chinese)
    [6]
    冯俊.快速公交通行能力研究[D].西安:长安大学公路学院, 2007.FENG Jun.Bus rapid transit capacity research[D].Xi’an:School of Highway, Chang’an University, 2007. (in Chinese)
    [7]
    李美玲, 牟振华, 任瑞波, 等.济南市BRT1号线运营调查与分析[J].公路与汽运, 2009 (132) :57-60.LI Mei-ling, MOU Zhen-hua, REN Rui-bo, et al.Investigation and analysis of operating condition at BRT1 in Jinan[J].Highways&Automotive Applications, 2009 (132) :57-60. (in Chinese)
    [8]
    中通BRT.LCK6180G-1_公交客车_产品中心-中通客车[EB/OL].[2013-12-01].http:∥www.zhongtong.com/product.php?id=54&fid=61.html.
  • Related Articles

    [1]WANG Dan, WANG Meng, WANG Xiaoxi, YANG Ping. Ensemble of Incremental Learning Algorithm for Flight Delay Prediction[J]. Journal of Beijing University of Technology, 2020, 46(11): 1239-1245. DOI: 10.11936/bjutxb2019030009
    [2]HAN Zhiling, YAN Yadan, WANG Dongwei. Impact Analysis of Non-motor Vehicles on Buses’ Stopping Process at Bus Stops[J]. Journal of Beijing University of Technology, 2016, 42(7): 1077-1081. DOI: 10.11936/bjutxb2015070063
    [3]ZHANG Hongguang, SHI Zhicheng, LU Haitao, LIU Hao. Study of Ignition Delay Time of Methane Based on a Rapid Compression Machine[J]. Journal of Beijing University of Technology, 2016, 42(4): 577-584. DOI: 10.11936/bjutxb2015050105
    [4]ZHOU Chen-jing, RONG Jian, FENG Xing-yu. Effects of Bicycle Traffic on Vehicular Delays at Signalized Intersections With Pre-right-turn Lanes[J]. Journal of Beijing University of Technology, 2015, 41(5): 742-748. DOI: 10.11936/bjutxb20140
    [5]YAO Bao-zhen, YU Bin, YANG Zhong-zhen. Dynamic Holding Strategy Based on Bus Arrival Time Prediction at Stops[J]. Journal of Beijing University of Technology, 2011, 37(6): 869-875. DOI: 10.3969/j.issn.0254-0037.2011.06.011
    [6]SHI Heng-hua, HE Jing-sha, XU Xin. Network Monitor Placement Method Based on Network Delay[J]. Journal of Beijing University of Technology, 2009, 35(6): 839-844. DOI: 10.3969/j.issn.0254-0037.2009.06.022
    [7]YANG Xiao-kuan, CAO Jing, GONG Jian. Study of the Effect of Bus Stop on Roadway Section Capacity[J]. Journal of Beijing University of Technology, 2008, 34(1): 65-71. DOI: 10.3969/j.issn.0254-0037.2008.01.012
    [8]ZHOU Sheng-hua, LIU Shu-yun. Persistence and Global Stability for Delay Nonautonomous Predator-prey System[J]. Journal of Beijing University of Technology, 2007, 33(8): 874-877,896. DOI: 10.3969/j.issn.0254-0037.2007.08.018
    [9]LIU Jiang, LÜ Qing-feng. Analysis of Delay Headway on Two-lane Highways on Mountainous Areas[J]. Journal of Beijing University of Technology, 2005, 31(5): 476-480. DOI: 10.3969/j.issn.0254-0037.2005.05.007
    [10]SHAO Zhang-qiao, RONG Jian, REN Fu-tian, YANG Zhen-hai. Further Study on the Relation Between Control Delay and Stop Delay[J]. Journal of Beijing University of Technology, 2002, 28(1): 18-21. DOI: 10.3969/j.issn.0254-0037.2002.01.005

Catalog

    Article views (20) PDF downloads (5) Cited by()

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return