Citation: | LUO Yan-bin, CHEN Jian-xun, WANG Meng-shu. Classification of Frost Damage Grades in Tunnel[J]. Journal of Beijing University of Technology, 2010, 36(4): 458-462. DOI: 10.3969/j.issn.0254-0037.2010.04.005 |
[1] |
重庆交通科研设计院.JTG D70—2004公路隧道设计规范[S].北京:人民交通出版社,2004.
|
[2] |
罗鑫,夏才初.隧道病害分级的现状及问题[J].地下空间与工程学报,2006,2(5):877-880.LUO Xin,XIA Cai-chu.Current situation and problems of classification of yunnel diseases[J].Chinese Journal ofUnderground Space and Engineering,2006,2(5):877-800.(in chinese)
|
[3] |
铁道部第二勘测设计院.铁路工程设计技术手册:隧道[M].北京:中国铁道出版社,1995:240-245.
|
[4] |
田俊峰,杨更社,刘慧.寒区岩石隧道冻害机理及防治研究[J].地下空间与工程学报,2007,3(8):1484-1489.TIAN Jun-feng,YANG Geng-she,LIU Hui.Study on the freezing damage mechanism and its prevention in cold region rocktunnel[J].Chinese Journal of Underground Space and Engineering,2007,3(8):1484-1489.(in chinese)
|
[5] |
张德华,王梦恕.青藏高原永久冻土区隧道施工新技术[J].岩石力学与工程学报,2004,23(24):4234-4237.ZHANG De-hua,WANG Meng-shu.New technology for tunneling in permafrost in qinghai-tibet plateau[J].Chinese Journalof Rock Mechanics and Engineering,2004,23(24):4234-4237.(in chinese)
|
[6] |
周泰文,王晓星,刘后.模糊数学基础简明教程[M].武汉:华中理工大学出版社,1993:165-186.
|
[7] |
陈建勋.公路隧道冻害防治技术[J].长安大学学报:自然科学版,2006,26(4):68-70.CHEN Jian-xun.Technique of preventing frost damage in highway tunnel[J].Journal of Chang an University:Natural ScienceEdition,2006,26(4):68-70.(in Chinese)
|
[8] |
陈建勋,罗彦斌.寒冷地区隧道温度场的变化规律[J].交通运输工程学报,2008,8(2):44-48.CHEN Jian-xun,LUO Yan-bin.Changing rules of temperature field for tunnel in cold area[J].Journal of Traffic andTransportation Engineering,2008,8(2):44-48.(in Chinese)
|
[9] |
陈建勋,罗彦斌.寒冷地区隧道防冻隔温层厚度计算方法[J].交通运输工程学报,2007,7(2):76-79.CHEN Jian-xun,LUO Yan-bin.Calculation method of antifreezing layer thickness in cold region tunnel[J].Journal of Trafficand Transportation Engineering,2007,7(2):76-79.(in chinese)
|