Citation: | TAO Lian-jin, JIN Liang, TANG Si-hai, ZHANG Yin-tao. Deformation Analysis of an Existing Subway Station Structure Traversed Down by a Large Shield Tunnel[J]. Journal of Beijing University of Technology, 2009, 35(10): 1350-1355. DOI: 10.3969/j.issn.0254-0037.2009.10.010 |
[1] |
钱七虎.城市可持续发展与地下空间开发利用[J].地下空间,1998,18(1):69-74.QIAN Qi-hu.Sustainable development of the cities and the development and utilization of underground space[J].Undergrourd Engineering and Tunmels,1998,18(1):69-74.(in Chinese)
|
[2] |
胡政才.北京地下直径线——我国大城市第一条地下电气化铁路隧道[J].现代隧道技术,2000(5):45-49.HU Zheng-cai.Beijing subway diameter line-the first electrified railway in major city in China[J].Modern TunnellingTechnology,2000(5):45-49.(in Chinese)
|
[3] |
李围,何川.盾构隧道近接下穿地下大型结构施工影响研究[J].岩土工程学报,2006,28(10):1277-1282.LI Wei,HE Chuan.Study on construction influence of shield tunnels traversing adjacently under underground large-scalestructure[J].Chinese Journal of Geotechnical Engineering,2006,28(10):1277-1282.(in Chinese)
|
[4] |
刘波,陶龙光,李希平,等.地铁盾构隧道下穿建筑基础诱发地层变形研究[J].地下空间与工程学报,2006,2(4):621-626.LIU Bo,TAO Long-guang,LI Xi-ping,et al.Research of ground settlement induced by metro shield tunnel beneathbuilding foundations[J].Chinese Journal of Underground Space and Engineering,2006,2(4):621-626.(in Chinese)
|
[5] |
张印涛,陶连金,边金.盾构隧道开挖引起地表沉降数值模拟与实测分析[J].北京工业大学学报,2006,32(4):333-337.ZHANG Yin-tao,TAO Lian-jin,BIAN Jin.Analysis of the numerical simulation of ground movement induced by shieldtunneling[J].Journal of Beijing University of Technology,2006,32(4):333-337.(in Chinese)
|
[6] |
叶康慨.北京铁路直径线大断面地下隧道盾构机选型研究[J].隧道建设,2006,26(6):20-23.YE Kang-kai.Type selection of shield machines for large cross-section underground railway tunnel on straight rail transit linein beijing[J].Tunnel Construction,2006,26(6):20-23.(in Chinese)
|
[7] |
王红伟.地铁车站使用阶段混凝土温度裂缝控制研究[J].都市快轨交通,2006,19(5):82-84.WANG Hong-wei.On the control of concrete cracking due to temperature in a subway station during its operation[J].UrbanRapid Rail Transit,2006,19(5):82-84.(in Chinese)
|
[8] |
刘波,韩彦辉.FLAC原理、实例与应用指南[M].北京:人民交通出版社,2005:272.
|
[9] |
刘元雪,施建勇.盾构法隧道施工数值模拟[J].岩土工程学报,2004,26(2):239-244.LIU Yuan-xue,SHI Jian-yong.Numerical simulation of excavation of shield tunnel[J].Chinese Journal of GeotechnicalEngineering,2004,26(2):239-244.(in Chinese)
|
[10] |
边金,陶连金,郭军.盾构隧道开挖引起的地表沉降规律[J].地下空间,2005,1(2):247-249.BIAN Jin,TAO Lian-jin,GUO Jun.The ground settlement monitoring of a shield tunnel[J].Undergrourd Engineeringand Tunmels,2005,1(2):247-249.(in Chinese)
|
[11] |
郭军,陶连金,边金.盾构法施工地铁区间隧道的地表沉降[J].北京工业大学学报,2005,31(6):589-592.GUO Jun,TAO Lian-jin,BIAN Jin.Ground surface settlement analysis during the subway tunnel excavation by shielding[J].Journal of Beijing University of Technology,2005,31(6):589-592.(in Chinese)
|