[1] |
陈秋南, 赵明华, 周国华, 等.复杂层状岩层隧道塌方原因分析及加固后信息化施工技术[J].岩土力学, 2009, 30 (3) :650-653.CHEN Qiu-nan, ZHAO Ming-hua, ZHOU Guo-hua, et al.Cause analysis of complex layered rock tunnel collapse and information construction technology after consolidation[J].Chinese Journal of Rock and Soil Mechanics, 2009, 30 (3) :650-653. (in Chinese)
|
[2] |
李志勇, 晏莉, 阳军生.浅埋偏压连拱隧道中导洞坍方数值分析与处理[J].岩土力学, 2007, 28 (1) :102-106.LI Zhi-yong, YAN Li, YANG Jun-sheng.Numerical analysis and treatment of a collapsed middle drift for shallow multi-arch tunnel under unsymmetrical pressure[J].Chinese Journal of Rock and Soil Mechanics, 2007, 28 (1) :102-106. (in Chinese)
|
[3] |
李晓红.隧道新奥法及其监控量测[M].北京:科学出版社, 2002.
|
[4] |
关宝树.隧道工程施工要点集[M].北京:人民交通出版社, 2003.
|
[5] |
李术才, 薛翊国, 张庆松, 等.高风险岩溶地区隧道施工地质灾害综合预报预警关键技术研究[J].岩石力学与工程学报, 2008, 27 (7) :1297-1306.LI Shu-cai, XUE Yi-guo, ZHANG Qing-song, et al.Key technology study on comprehensive prediction and earlywarning of geological hazards during tunnel construction in high-risk karst areas[J].Chinese Journal of Rock Mechanics and Engineering, 2008, 27 (7) :1297-1306. (in Chinese)
|
[6] |
张民庆, 黄鸿建, 田四明.岩溶隧道安全设计、施工与管理[J].铁道工程学报, 2007 (5) :75-85.ZHANG Min-qing, HUANG Hong-jian, TIAN Si-ming.Safe design, construction and management of karst tunnel[J].Journal of Railway Engineering Society, 2007 (5) :75-85. (in Chinese)
|
[7] |
谭代明, 漆泰岳, 莫阳春.侧部岩溶隧道围岩稳定性数值分析与研究[J].岩石力学与工程学报, 2009, 28 (2) :3497-3503.TAN Dai-ming, QI Tai-yue, MO Yang-chun.Numerical analysis and research on surrounding rock stability of lateral karst cave tunnel[J].Chinese Journal of Rock Mechanics and Engineering, 2009, 28 (2) :3497-3503. (in Chinese)
|
[8] |
尚寒春.华蓥山隧道东口岩溶分析及溶洞处理[J].铁道工程学报, 2007, (8) :58-61.SHANG Han-chun.Analyses of karst at eastern portal of huaying mountain tunnel and treatment of karst cave[J].Journal of Railway Engineering Society, 2007, (8) :58-61. (in Chinese)
|
[9] |
林本涛.干溪沟隧道岩溶整治分析[J].铁道工程学报, 2006, (7) :54-58.LIN Ben-tao.Analysis of treatment of karst in Ganxigou tunnel[J].Journal of Railway Engineering Society, 2006, (7) :54-58. (in Chinese)
|
[10] |
赵明阶, 敖建华, 刘绪华.岩溶尺寸对隧道围岩稳定性影响的模型试验研究[J].岩石力学与工程学报, 2004, 23 (2) :213-217.ZHAO Ming-jie, AO Jian-hua, LIU Xu-hua, et al.Model testing research on influence of karst cave size on stability of surrounding rockmasses during tunnel construction[J].Chinese Journal of Rock Mechanics and Engineering, 2004, 23(2):213-217. (in Chinese)
|