地下水有限单元法计算中第一类边界(Г1)变水位值的确定方法-‘BT’法

    ‘BT’ method a method to determine changing Water level value on the border (Γ1) Type 1 calculation in limited unit method for underground water

    • 摘要:BT’法是矿山地下水疏干和城市厂矿供水应用有限单元计算的一种方法。该法是:首先应用解析法来确定(Γ1)边界上各节点随时间变化的水位值(BT值),然后用有限单元法来计算内节点及(Γ2)边界上节点的水位值;从参数优选到内节点水位预报,都由计算机自动完成。

       

      Abstract: ‘BT’ method is a method in application of limited unit method to dredging the trunk line of underground water in the mineral area and supplying water for urban districts, factories and mines. The procedure is, first to determine the water level value (BT value) changing with the passage of time at each joint on the border (p1) by applying analytics, and then to calculate the inner joint and the water levelv alue at the joint on the border (p2) by using limited unit method; hence all the work, from parametric optimization to predication of water level at the inner joint, are done automatically by computers.

       

    /

    返回文章
    返回