北京地铁某车站明挖基坑施工监测分析
Construction Monitoring Analysis for an Open Excavated Foundation-pit of a Subway Station in Beijing
-
摘要: 对北京地铁某车站明挖基坑施工跟踪监测,及时掌握基坑变形、支撑内力的变化动态,分析了施工过程中支护结构位移与内力的变化特征,并指导施工确保基坑稳定。测试表明:a)围护结构水平位移随工期的延续而增加,基坑开挖完成后逐渐趋于稳定,位移在第2道支撑处最大,围护结构底部位移较小;b)第1道钢支撑的轴力明显大于第2道和第3道支撑的轴力,c)在基坑阳角处斜钢支撑的轴力比其他位置钢支撑的轴力要大得多。Abstract: A field monitoring programme is carried out for the open-excavated project of a subway station in Beijing,the trends of the displacements and the inner forces are under control,and the change of characteristics of displacements and inner forces in the retaining structure during the construction is analyzed.The necessary engineering measurements are taken to keep the stability of the excavated foundation pit.There are several monitoring conclusions as follows:a)the horizontal displacements of retaining structure increase with the construction duration and tend to be ltable gradually after the foundation-pit excavation is completed,The largest displacement appears on the second layer steel support tube and the displacement is the smallest in the bottom of retaining structure;b)the axial forces on the first layer steel-support tube significantly greater than those of the second and the third layers;and c)the axial forces on the diagonal steel-support tubes in the outside corner of the foundation-pit are much greater than those of the others.