[1] |
王国欣,谢雄耀,黄宏伟.公路隧道洞口滑坡的机制分析及监控预报[J].岩石力学与工程学报,2006,25(2):268- 274.WANG Guo-xin,XIE Xiong-yao,HUANG Hong-wei.Mechanism analysis and monitoring forecast of landslide at road tun- nel face[J].Chinese Journal of Rock Mechanics and Engineering,2006,25(2):268-274.(in Chinese)
|
[2] |
王梦恕,皇甫明.海底隧道修建中的关键问题[J].建筑科学与工程学报,2005,22(4):1-4.WANG Meng-shu,HUANGFU Ming.Key problems on sub-sea tunnel construction[J].Journal of Architecture and Civil Engineering,2005,22(4):1-4.(in Chinese)
|
[3] |
曾超,张建斌.厦门翔安(海底)隧道土建工程简介[C]//海底与水下隧道国际学术交流会,北京:北京交通大学,2005.ZENG Chao,ZHANG Jian-bin.Introduction of Xiamen Xiang' An subsea tunnel civil engineering[C]//International Confer- ence on the Undersea Tunnels,Beijing:Beijing Jiaotong University,2005.(in Chinese)
|
[4] |
郭小红.对厦门东通道海底隧道几个技术问题的探讨[C]//海底与水下隧道国际学术交流会,北京:北京交通大学,2005.GUO Xiao-hong.A study on several technical problems of Xiamen Xiang' An subsea tunnel[C]// International Conference on the Undersea Tunnels,Beijing:Beijing Jiaotong University,2005.(in Chinese)
|
[5] |
郭衍敬,张明聚,张斌.海底隧道穿越风化深槽施工方案[J].北京工业大学学报,2006,32(6):520-525.GUO Yan-jing,ZHANG Ming-ju,ZHANG Bin.A construction solution to tunneling through the deep weathered rock trough of sub-sea tunnels[J].Journal of Beijing University of Technology,2006,32(6):520-525.(in Chinese)
|
[6] |
关宝树.隧道工程施工要点集[M].北京:人民交通出版社,2004.
|
[7] |
王梦恕.地下工程浅埋暗挖技术通论[M].合肥:安徽教育出版社,2004.
|
[8] |
刘波,韩彦辉.FLAC原理、实例与应用指南[M].北京:人民交通出版社,2005.
|
[9] |
徐林生,孙均.洋碰隧道CRD工法施工过程的动态仿真数值模拟研究[J].地质灾害与环境保护,2001,12(1):58- 63.XU Lin-sheng,SUN Jun.Numerical Simulation of dynamic emulation on CRD construction process in Yangpeng tunnel[J]. Journal of Geological Hazards and Environment Preservation,2001,12(1):58-63.(in Chinese)
|